How to Design Quenching and Heating Die
1: In the hot and cold water transport channel, the use of waterproof rings shall be minimized; (High temperature type must be used),
It is better to hit the nozzle directly on the mold core. Taper fine teeth (such as PT1/8; PT1/4;)
This is safer.
2. The layout of the water delivery pipeline is generally as follows:? 5–? 6mm shall be evenly distributed, and the spacing is generally
The center of 15-20mm water delivery pipe is 10-15mm from the formed surface; And the waterway layout should be dense.
3: The mold water channel connector must be designed at the upper and lower side or rear side of the mold; Operation side (standing on the side of people)
It is not allowed to have water channel inlet and outlet or water pipe layout to avoid injury to production personnel due to pipe breakage. Remember!
4: The construction holes (unnecessary holes) of the mold shall be plugged with plugs to ensure no air or water leakage,
The method is to use copper plug first, and then use taper throat teeth and high temperature resistant glue to seal